FCC Construction Requirements and Auto Termination

Most wireless licensees are required to construct their authorized system or meet specific coverage requirements within a given time period and to notify the Commission that the requirement was met. If a licensee fails to construct a frequency, location, or an entire license, or fails to meet a coverage requirement, then the frequency, location, or license terminates automatically as of the applicable construction/coverage deadline.